Flatbed or step deck?
A standard flatbed has one deck height and the widest choice of trucks, so it is the default for steel, lumber, pipe and most building products. A step deck drops the rear deck closer to the road, which gives tall freight more room under the legal height limit. That is why tall machinery, equipment and some stacked building products ride a step deck.
Step deck capacity is thinner than flatbed, so on secondary lanes plan a day ahead. Both trailers load from the side, the top or the ground, and a step deck can also take ramp-loaded equipment.
Legal size and when permits come in
Throughline checks each piece on an open-deck load against the federal legal envelope: 102 inches wide, 13 feet 6 inches high including the trailer and 53 feet long, with the truck at 80,000 pounds gross. A piece past the width, height or length limit is flagged as oversize before a carrier is sourced, and you confirm it, because it may need state permits and escorts. Permitted oversize and project cargo are better served by a specialized heavy-haul desk, and Throughline will say so rather than quote it.
Send the real dimensions and weight with the quote. A load quoted on guessed dimensions is the one that turns out to be over height at pickup.
Tarps, securement and partial deck loads
Freight that must stay dry needs tarps, and the quote form takes the tarp type and size: lumber, steel, smoke or coil tarps, in 4, 6 or 8 foot drops. Tarps can only be ordered on open-deck equipment, so a tarp request cannot end up on a van by mistake. Say what the carrier must bring for securement, such as chains, straps, edge protection or dunnage.
Not every flatbed load fills the deck. Partial deck loads are routine on flatbed and step deck, and they are priced by the length of deck they use, so send the length of the freight as well as its weight.
- Steel coils, plate, beams and pipe
- Lumber, trusses, panels and other building materials
- Machinery and equipment within legal size
- Precast, landscaping and construction products
How a flatbed load runs with Throughline
Start on the quote page for an instant all-in estimate with a low-to-high spread and a confidence level, email the load with drawings or a packing list, or send a lane spreadsheet for repeat lanes. Flatbed capacity tightens sharply in construction season, so give lead time in spring and summer. A firm quote stays good for 3 days. After that we refresh it, and live truck options can change the price. “Hold for me” is the default: no carrier is booked on your load without your OK.
Before any rate con goes out, we check active FMCSA authority and carrier identity, require at least $100,000 cargo and $750,000 auto liability insurance, match the carrier's phone to its FMCSA record, and screen against a library of known fraud patterns. Anything that can't be confirmed goes to a person — it doesn't go through.
After booking you hear when the carrier is assigned, at pickup with the driver’s name and mobile, if the load is running late, at delivery and when the POD is on file. When the POD is verified, your invoice arrives as one PDF with the POD and BOL attached.