Which trailer metals need
Product form, finish and how the receiver unloads decide the trailer:
- Flatbed: hot-rolled coil, plate, structural shapes, rebar, bar and pipe — anything unloaded by crane or forklift from the side or top
- Flatbed with coil racks or a coil well: steel coils, which need specific blocking and chaining so they cannot roll or shift
- Tarped flatbed: cold-rolled, galvanized, coated or polished product that must stay dry but still loads from the side or top
- Step deck: taller bundles or fabricated pieces that would be over height on a standard flatbed
- Dry van: boxed or palletized metal products, wire, fasteners and smaller coils that a dock forklift can handle
What goes wrong on metals loads — and how to prevent it
Weight is the first problem. Metals reach legal gross weight long before they fill a trailer, so the piece weights, the total and how the load is spread over the axles all matter. A bill of lading that understates weight leads to an overweight ticket or a load that has to be reworked at the scale.
Securement is the second. Federal cargo securement rules include a section written specifically for metal coils, and shippers and receivers often add their own requirements for chains, straps, edge protection and dunnage. Rust and water damage are the third: finished product that arrives wet can be rejected outright.
Throughline asks for the commodity, piece weights, dimensions, coil orientation, tarp and securement requirements when you request the quote and keeps them attached to the load through carrier review, so the carrier that gets approved has the right trailer and equipment. Tarping and other known accessorials are priced as separate lines on top of the linehaul.
Capacity and timing
Metals shippers usually compete for the same flatbed trucks as construction, machinery and agricultural freight, so flatbed capacity tends to tighten in spring and summer and loosen in winter. Mills and service centers also ship on tight loading windows, and a truck that misses its slot can wait a day for the next one.
Throughline’s instant estimate shows a plain-language capacity read for the lane — tight, balanced or loose — next to the estimate and its confidence level. When a truck is not confirmed as pickup nears, you get options by email rather than a surprise at the gate.
Who this is for
Steel and aluminum mills, metal service centers and distributors, pipe and tube producers, and fabricators that ship full truckloads every week — to other service centers, OEM plants, fabricators and construction projects. Before any rate con goes out, we check active FMCSA authority and carrier identity, require at least $100,000 cargo and $750,000 auto liability insurance, match the carrier's phone to its FMCSA record, and screen against a library of known fraud patterns. Anything that can't be confirmed goes to a person — it doesn't go through. Carriers with an Unsatisfactory FMCSA safety rating or an active out-of-service order are never dispatched, and a Conditional rating needs a manager’s sign-off.